intermediate
segway
max-pro
sop

SOP - Installation After Unpacking (MAX PRO)

Visual SOP for initial assembly after unpacking a new MAX PRO scooter

Levy Fleets TeamMarch 23, 20263 min read

SOP - Installation After Unpacking (MAX PRO)

Initial assembly and setup procedure for a new Segway MAX PRO scooter after unpacking from the shipping box.

Visual SOP

The following image provides the step-by-step visual instructions for this procedure on the Segway MAX PRO (MAX 2.2) scooter.

SOP - Installation After Unpacking (MAX PRO) - Visual SOP

Before You Begin

  • Ensure the scooter is powered off and in Transport Mode before performing any disassembly
  • Have the correct tools and replacement parts ready
  • Follow all steps in the sequence shown in the SOP image
  • Contact Segway support if you are unsure about any step