intermediate
repair
scooter
dashboard

Segway Max Pro (2.2) Electric Scooter - Dashboard Repair Video

Video repair guide: Segway Max Pro (2.2) Electric Scooter - Dashboard Repair Video

Levy Fleets TeamMarch 25, 20269 min read

Segway Max Pro (2.2) Electric Scooter - Dashboard Repair Video

How to replace the dashboard?Tool preparation Torque screwdriver, T10, T25, T30, PH1, cable tie, new dashboard. Remove the stem assembly

Remove 1 M510 screw on the front side of the front tube with T25.Remove 2 M616 screws on the back side of the front tube with T30. Pull out the stem, disconnect the connection of control bus, Remove the black plate cover of the brake box, Take the brake cable plastic connector from the groove of the brake box, Brake cable pass through the open slot of front tube, Remove the brake cable connector from the brake cable box, then take off the stem assembly. Remove the dashboard Remove 3 screws M310 with T10 and take off the dashboard cover. Remove 3 screws M25 on the dashboard. . Remove the zip and cut off the cable tieDisconnect the electric throttle, the electronic brake and the headlight leads from the dashboard, and then take off the dashboard Install the new dashboard Pass the dashboard cable from the left side hole of the stem. Connect the throttle, the electric brake and the headlight leads to the dashboard. Install the cable zip and cable tie. Tighten 3 screws M25 with PH1, Torque: 0.24±0.02N·m. Install dashboard cover and tighten 3 screws M310 with T10, Torque: 0.2-0.3N·m. Install the stem assembly

Insert the brake cable from the open slot of front tube, insert the other end of the cable into the brake box, The brake cable plastic connector is installed in the groove of the brake wire box, Install plate cover of the brake box. Connect the control bus and insert the stem into the front tube. Tighten 2 M616 screws with T30, Torque: 9-12N·m. Tighten 1 M510 screw with T25, Torque: 5-6N·m Function detection Power on the scooter, and confirm that it functions properly