Segway L60E Electric Scooter - Iot Repair Video
Use the T30 batch head to remove the two screws and the screw washer (P1), pull out the IOT(P2), disconnect the wiring harness of the IOT assembly (P3), and remove the IOT.
Take new IOT assembly and connect wiring harness (P4); The IOT was inserted downward into the vertical tube notch, the bottom end of which was inserted into the notch first, and then the whole vertical tube (P5). The T30 batch head was used to tighten the two screws (P6) on the back of the IOT with a torque of 3.5-4N·m.